-
Institution:
-
The University of Texas at El Paso
-
Subject:
-
-
Description:
-
Integration, Verification and Validation (IV&V) process and the recommended activities at each of the different program phases. Includes verification planning, verification methods and validation methods during development, during launching and operations of the product/system; test bed requirements and unitary test, subsystem tests and integration test data collection analysis and systems requirement validation. Test reporting and modification or Change request processes that need to be initiated.
-
Credits:
-
3.00
-
Credit Hours:
-
-
Prerequisites:
-
-
Corequisites:
-
-
Exclusions:
-
-
Level:
-
-
Instructional Type:
-
Lecture
-
Notes:
-
-
Additional Information:
-
-
Historical Version(s):
-
-
Institution Website:
-
-
Phone Number:
-
(915) 747-5000
-
Regional Accreditation:
-
Southern Association of Colleges and Schools
-
Calendar System:
-
Semester
Detail Course Description Information on CollegeTransfer.Net
Copyright 2006 - 2025 AcademyOne, Inc.