TBCC 7130 - Conceptual Cost Est.

Institution:
Georgia Southern University
Subject:
TBCC Building Contruction Tech
Description:
A study of preliminary construction cost estimating methods including Order of Magnitude estimates, Area and Volume estimates and Assemblies (Systems) estimates. Emphasis is on Assemblies estimating and a project is required. Systems include superstructure, foudation, roofing, exterior closure, mechanical, electrical, interior construction, site work, and general conditions. Three single period lectures.
Credits:
3.00
Credit Hours:
Prerequisites:
Corequisites:
Exclusions:
Level:
Instructional Type:
Lecture
Notes:
Additional Information:
Historical Version(s):
Institution Website:
Phone Number:
(912) 478-5391
Regional Accreditation:
Southern Association of Colleges and Schools
Calendar System:
Semester

The Course Profile information is provided and updated by third parties including the respective institutions. While the institutions are able to update their information at any time, the information is not independently validated, and no party associated with this website can accept responsibility for its accuracy.

Detail Course Description Information on CollegeTransfer.Net

Copyright 2006 - 2025 AcademyOne, Inc.