-
Institution:
-
Front Range Community College
-
Subject:
-
-
Description:
-
Provides a study of the Toyota Production Systems (TPS), also known as Lean Manufacturing, Just-in-Time (JIT) Demand flow, or Build-to-Order. The course covers the build-to-forecast batch-process method and compares it with TPS concepts/methods: customer expectations, seven fundamental wastes, plan-do-check-act cycle, kanban system and kanban types, material flow group technology, manufacturing cells, point-of-use storage and support, and setup/changeover time reduction. This course also covers application of the following problem solving tools: flowchart, cause-andeffect diagram, check sheet, pare to chart, root cause analysis, statistical process control. Students investigate the basics of high-mix, low-volume manufacturing. 45 Contact Hours. Prerequisites: MTE 110 or permission of instructor.
-
Credits:
-
3.00
-
Credit Hours:
-
-
Prerequisites:
-
-
Corequisites:
-
-
Exclusions:
-
-
Level:
-
-
Instructional Type:
-
Lecture
-
Notes:
-
-
Additional Information:
-
-
Historical Version(s):
-
-
Institution Website:
-
-
Phone Number:
-
(303) 404-5000
-
Regional Accreditation:
-
North Central Association of Colleges and Schools
-
Calendar System:
-
Semester
Detail Course Description Information on CollegeTransfer.Net
Copyright 2006 - 2025 AcademyOne, Inc.