-
Institution:
-
Honolulu Community College
-
Subject:
-
-
Description:
-
Prerequisite: RAC 40 RAC majors only. Duct sizing, duct devices, system design, system balance, control systems, double-duct systems, hydraulic systems, centrifugal systems, and heat pumps. Advanced maintenance, troubleshooting, system balance, control setup, water testing and engineering studies on central station chill water air conditioning system and operation of a maintenance shop. Safety and Physics content applicable to the RAC area. (24 hrs. lect./lab. per week)
-
Credits:
-
12.00
-
Credit Hours:
-
-
Prerequisites:
-
-
Corequisites:
-
-
Exclusions:
-
-
Level:
-
-
Instructional Type:
-
Lecture
-
Notes:
-
-
Additional Information:
-
-
Historical Version(s):
-
-
Institution Website:
-
-
Phone Number:
-
(808) 845-9211
-
Regional Accreditation:
-
Western Association of Schools and Colleges
-
Calendar System:
-
Semester
Detail Course Description Information on CollegeTransfer.Net
Copyright 2006 - 2026 AcademyOne, Inc.