-
Institution:
-
California State University-Sacramento
-
Subject:
-
-
Description:
-
Simulation of three phase operations and transmission line operation including voltage regulation, efficiency of long lines, power system stability, voltage control and load-frequency control, load flow and optimal dispatch for simplified interconnected systems. Prerequisite: EEE 130, EEE 141, and (GWAR Certification before Fall 09, or WPJ score of 70+, or at least a C- in ENGL 109M/W). Graded: Graded Student. Units: 1.0
-
Credits:
-
1.00
-
Credit Hours:
-
-
Prerequisites:
-
-
Corequisites:
-
-
Exclusions:
-
-
Level:
-
-
Instructional Type:
-
Lecture
-
Notes:
-
-
Additional Information:
-
-
Historical Version(s):
-
-
Institution Website:
-
-
Phone Number:
-
(916) 278-6011
-
Regional Accreditation:
-
Western Association of Schools and Colleges
-
Calendar System:
-
Semester
Detail Course Description Information on CollegeTransfer.Net
Copyright 2006 - 2025 AcademyOne, Inc.